Here you can download the free lecture Notes of Prestressed Concrete Structures Pdf Notes – PCS Pdf Notes materials with multiple file links to download. Prestressed Concrete Structures  Notes Pdf – PCS Notes Pdf book starts with the topics Detailed estimate, Abstract estimate, Material should be waterproof and corrosion resistant, advantages of prestressed concrete bridges.

Prestressed Concrete Structures Notes pdf | PCS notes pdf | Prestressed Concrete Structures | Prestressed Concrete Structures Notes | PCS Notes

The Prestressed Concrete Structures Pdf Notes – PCS Pdf Notes

Prestressed Concrete Structures Notes are listed below please check it –

Unit 1

Link: Complete Notes

Unit 2

Link: Unit 1 Notes

Unit 3

Link: Unit 2 Notes

Unit 4

Link: Unit 3 Notes

Unit 5

Link: Unit 4 Notes

Unit 6

Link: Unit 5 Notes

Note :- These notes are according to the R09 Syllabus book of JNTU. In R13 and R15,8-units of R09 syllabus are combined into 5-units in R13 and R15 syllabus. If you have any doubts please refer to the JNTU Syllabus Book.

Prestressed Concrete Structures Notes Pdf – PCS Notes Pdf

Unit-1:

Detailed estimate,Abstract estimate,Preliminary Estimate or Rough cost estimate,Plinth area estimate,Cube Rate Estimate or Cubical Content Estimate,Approximate QuantityMethod Estimate,Detailed Estimate or Item Rate Estimate,Revised Estimate,Supplementary Estimate And Revised Estimate,Annual Repair or Maintenances Estimate,Supplementary.

Unit-2:

Material should be waterproof and corrosion resistant, natural ventilation provided should be adequate. A manhole should be provided to permit inspection and cleaning. Baffles should be limited to one at the inlet and one at the outlet.

Unit-3:

functions of water stopper (water bar) in water tank construction, Prestressed cylinder pipe, Prestressed non-cylinder pipe, circular prestressing, stage constructions.

Prestressed Concrete Structures Pdf Notes – PCS Pdf Notes

Unit-4:

propped construction, Prestressing force, Self-weight of the beam, Dead load of the concrete, Live load acting on the concrete.

Unit-5:

advantages of prestressed concrete bridges, advantages of post tensioning system, Post tensioning is suitable for heavy cast in place members, The waiting period in the casting bed is less, The transfer of prestress is independent of transmission length.

Follow us on Facebook : Btechnotes

About Btech Notes

Check Also

Materials Engineering & Metallurgy Notes VSSUT | MEM Notes VSSUT

Materials Engineering & Metallurgy Notes VSSUT | MEM Notes VSSUT

Materials Engineering & Metallurgy Notes VSSUT – MEM Notes VSSUT of Total Complete Notes Please …

Leave a Reply

Your email address will not be published. Required fields are marked *